General Discussion

Collapse
X
 
  • Time
  • Show
Clear All
new posts

  • banuthev
    replied
    Originally posted by Haleef
    Yes in my opinion, I think they need more better, and more useful engines. Even today I was on an M6 locomotive's cab while it was hauling a coastal line slow train, and I realised the locomotive finds it very difficult to pull the train. Even the driver was mentioning that it barely pulls 8 carriages alone on the up country line. But nevertheless, still a brilliant locomotive, in service for almost 38 years.
    The coaches look good, but I doubt SLR will purchase coaches as such. Also new trains will be arriving later this year soon, as the tracks leading to the Colombo Port and also in some areas around Dematagoda are currently being/already been replaced with new rails and sleepers, and also ballast :P .
    Do you know how many Astra and CSR carriages are currently in service in Sri Lanka ? According to below article, 1000 Astra carriages were delivered to Sri Lanka in 1970 and in 2014, SLR agreed to get 280 more carriages from Astra. Please give me an update if all the 280 carriages have been delivered from Astra to SLR ?

    Also according to Railpage's statistics, only 565 carriages were in use by SLR in 2014. Where all the remaining 435 coaches ?

    Astra Passenger Coaches is in talks with Sri Lanka Railways (SLR) for the delivery of 280 passenger coaches. The negotiations for the procurement of 160 coaches delivered urgently and 120 in a second phase of the contract are taking place at Astra’s manufacturing plant in Arad.

    It is not the first time SLR and Astra collaborate. In 1970, SLR imported 1000 coaches produced by the Romanian rolling stock manufacturer. These have been refurbished a couple of years ago and are also used by private passenger operators Expo Rail and Rajadhani Express, in partnership with SLR.

    http://www.think-railways.com/astra-...anka-railways/
    Attached Files

    Leave a comment:


  • Serendib
    replied
    Professionals push connectivity, access in Sri Lanka rail electrification .

    Aug 11, 2017 18:49 PM GMT+0530

    ECONOMYNEXT – Sri Lankan transport professionals have praised a plan to electrify the railway but want more careful study and inclusion of multi-modal connectivity, freight and station accessibility to ensure the investment’s best use.

    Preliminary designs for the electrification and modernisation of the railway between Veyangoda, north of the capital Colombo, and Panadura on the coast to the south are almost ready, said Rodolfo Martinez, a consultant to the project.

    The modernisation will be done according to the Colombo suburban railway master plan, he told a recent forum held by the Chartered Institute of Logistics & Transport, Sri Lanka.

    The modernisation, catering mainly to passenger transport, will result in a better and more reliable suburban commuter railway service, along with upgrades to stations, Martinez said during the 15th John Diandas Memorial Lecture.

    The government’s Western Region Megapolis master plan covering the Colombo metropolitan region shows potential demand available in Colombo for rail travel, he said.

    “If you provide the service, demand will come because demand is there. The plan assumes the Colombo metropolitan region will continue to grow.”

    Martinez said Sri Lanka cannot afford not to modernise the railway and improve public transport given increasing congestion on the roads.

    The railway was already a big asset Colombo has and could be better used with modifications and modernisation, the results of which would be seen in three years.

    Martinez said stations will be modernised with better passenger information, electronic ticketing but that integration with buses remains to be done.

    However, transport professionals at the forum pressed for a more wide-ranging study and project that would include station accessibility, multimodal links between rail and other modes like bus, and freight carriage.

    “The study should be realistic. This country has a lot of examples of putting capacity where we don’t need it and not having capacity where we need,” said Amal Kumarage, senior professor of the University of Moratuwa Department of Transport & Logistics.

    The feasibility study should include forecasts of railway patronage with station development with bus accessibility and without, he told the forum.

    “That’s why we need to include bus and railway station development. That’s the scientific way forward. Saying that’s another study is not the best way forward,” Kumarage said.

    The Megapolis project growth rate forecasts had turned out to be “highly optimistic” and below what was projected in the feasibility study two years ago.

    “We know the Megapolis plan numbers have not been validated,” Kumarage said. “We need high, low and moderate growth scenarios. It seems only the high growth factor was looked at.”

    Good connections to railway stations and speeds between stations were needed to make rail attractive compared with road transport.

    “People make door-to-door decisions, so speeds are important. You may not have much margin over bus travel. So the investment may not be worth it unless you have good speeds between stations and very good connections to railway stations. That’s why the access aspect seems a bit underrepresented in this study. That’s critical.”

    Kumarage said the feasibility study should also consider rail fares in the modernised system to see if higher prices would affect potential demand and how big a subsidy would be needed.

    “I don’t think any country makes money on urban passenger transport by rail. The benefit is in the economy.”

    The suburban railway master plan should consider better connectivity, he said, noting how railway connections to the island’s ports and international airport had been neglected.

    “in Sri Lanka the railway to the airport stops 100 metres from the airport, the same way rail goes up to the wall of Colombo port. It’s a unique situation. We have to look at connectivity, multimodalism, freight connectivity.”

    Palitha Samarasinghe, Railway Electrification and Modernization Project director, said freight transport was not covered within the scope of the project but be done in a separate study.

    “We need at least 50km distance to move freight for it to be commercially viable for the railway department.”

    Kumarage said passenger and freight transport should not be looked at separately but in an integrated manner.

    “Colombo is unique with the port right within the city. So we cannot exclude goods movement from the railway network.

    “Goods movements are mostly in the Western province so a lot can be connected with railway since the aim is easing congestion. It may be better to move freight by rail.

    ”The feasibility should consider it. This is where we go wrong –leaving this for another study. We might solve the passenger problem and keep the freight problem and might never be able to use the system for freight. That’s what has happened for the past 40-50 years –the railway gradually lost money-making freight and got loss-making passengers.”
    (COLOMBO, August 11, 2017)

    Leave a comment:


  • Serendib
    replied
    Freight neglected in Colombo Suburban Railway Project

    While electrification and modernisation of railways is much needed for the development of the country’s logistics sector, freight has been completely neglected in the Colombo Suburban Railway Project. Also while the initial ground work on the project has already commenced, no backup plan has been prepared to face the upcoming power crisis.

    A feasibility study on the Asian Development Bank-funded project was presented by Rodolfo Martinez, consultant to the railway electrification and modernization project of Sri Lanka at the 15th John Diandas Memorial Lecture organised by the Chartered Institute of Logistics and Transport at the Institute of Engineers Sri Lanka recently.

    Mr. Martinez stated that the Western Province Megapolis Plan expects the daily rail passenger demand to increase to 1.2 million by 2025 and 1.4 million by 2035 from the 300,000 figure recorded in 2016. The electric railway plan serves five different corridors in Colombo and additional tracks would be necessary in some sections as the demand grows.

    The first phase of the project would be a 70 km section from Panadura to Veyangoda with 23 stations. The station to station commercial speed would be around 40 km per hour, once modernized and electrified, he noted. During the panel discussion Moratuwa University Department of Transport and Logistics Professor, Amal Kumarage pointed out that the project has completely neglected the money-making freight component and only addressed the loss making-passenger transportation over the years and it still continues. He stressed that railway connectivity should be made to the main airports and harbours to ease freight movement.

    Noting that the numbers projected under the Megapolis plan seems to be unrealistic and not validated, Prof. Kumarage elaborated, “The Megapolis project has based its projections off a study done several years ago when growth of demand for railroad had been high, and in the years since, the demand growth for it has been much lower.”

    The power crisis is one of the biggest problems the country is about to face very soon, stated Energy Consultant Dr. Tilak Siyambalapitiya. “While only one per cent of the current supply is required for railway electrification, there is no backup plan to face the expected power crisis. Renewable energy sources could only be used as a supplementary source of power and cannot be a backup,” noted Dr. Siyambalapitiya.

    http://www.sundaytimes.lk/170806/bus...ct-252865.html

    Leave a comment:


  • Haleef
    replied
    Originally posted by banuthev
    Haleef,

    Do you think SLR really need the more Diesel locomotives? I think SLR better invest on confortable coaches. What do you think LHB Coaches which are being built in India by German manufacturer.

    LHB Coaches : https://en.m.wikipedia.org/wiki/LHB_Coaches
    Yes in my opinion, I think they need more better, and more useful engines. Even today I was on an M6 locomotive's cab while it was hauling a coastal line slow train, and I realised the locomotive finds it very difficult to pull the train. Even the driver was mentioning that it barely pulls 8 carriages alone on the up country line. But nevertheless, still a brilliant locomotive, in service for almost 38 years.
    The coaches look good, but I doubt SLR will purchase coaches as such. Also new trains will be arriving later this year soon, as the tracks leading to the Colombo Port and also in some areas around Dematagoda are currently being/already been replaced with new rails and sleepers, and also ballast :P .

    Leave a comment:


  • banuthev
    replied
    Originally posted by Serendib
    01. Obtaining funds for Department of Railway to purchase 09 diesel power sets (Document No – 07)

    The proposal made by Hon. Prime Minister Ranil Wickremesinghe, in his capacity as the Minister of National Policies and Economic Affairs, to enter into loan agreements with Hong Kong and Shanghai Banking Corporation and Hatton National Bank for obtaining funds for the above project, which the cost is estimated as USD 93.86, was approved by the Cabinet of Ministers.

    DECISIONS TAKEN BY THE CABINET OF MINISTERS AT ITS MEETING HELD ON 25-07-2017

    NEWS.LK
    Haleef,

    Do you think SLR really need the more Diesel locomotives? I think SLR better invest on confortable coaches. What do you think LHB Coaches which are being built in India by German manufacturer.

    LHB Coaches : https://en.m.wikipedia.org/wiki/LHB_Coaches

    Leave a comment:


  • Serendib
    replied
    03. Maintaining and expanding rail road network ( Document No 12)

    The proposal made by Hon. Prime Minister Ranil Wickremesinghe, as the Minister of National policies and Economic Affairs to hold negotiations and enter in to agreements on long facilities provided by the Austrian Government, to implement a project at a cost of 7.6 million Euros, for following activities, was approved by the Cabinet of Ministers.

     Reestablishment of 07 bridges which are more than 100 years old in coastal, Northern and Matale lines.
     Renovation of Maho, Galle and Dematagoda
     Provision of tools and equipment for maintenance of rail road network.

    DECISIONS TAKEN BY THE CABINET OF MINISTERS AT ITS MEETING HELD ON 01-08-2017

    Leave a comment:


  • Serendib
    replied
    Wade Shepard ,  CONTRIBUTOR Courtesy Forbes February 10, 2015, a Sri Lankan official looks at cars standing at the port facility at Hambantota. From a multi-million dollar airport ignored by airlines to a lavish cricket stadium rejected by players, Sri Lanka’s new government is mulling the future of a string of white elephants. LAKRUWAN WANNIARACHCHI/AFP/Getty Images A […]

    Leave a comment:


  • Serendib
    replied
    01. Obtaining funds for Department of Railway to purchase 09 diesel power sets (Document No – 07)

    The proposal made by Hon. Prime Minister Ranil Wickremesinghe, in his capacity as the Minister of National Policies and Economic Affairs, to enter into loan agreements with Hong Kong and Shanghai Banking Corporation and Hatton National Bank for obtaining funds for the above project, which the cost is estimated as USD 93.86, was approved by the Cabinet of Ministers.

    DECISIONS TAKEN BY THE CABINET OF MINISTERS AT ITS MEETING HELD ON 25-07-2017

    NEWS.LK

    Leave a comment:


  • dilushasg-bdavi
    replied

    Sri Lanka's sports minister gave his support Wednesday for an investigation into the country's controversial 2011 World Cup loss against India, amid fresh allegations of match fixing.


    Pure BS......the Indians were the better team that night in Mumbai

    Leave a comment:


  • banuthev
    replied
    Hatton Train Road is Clear



    Source: Lakbima NewsPaper

    Leave a comment:


  • Haleef
    replied
    Originally posted by banuthev
    What is the train name ? why it was hauled by two locos on the day of the accident ? According to above video, one of the loco which hauled the train was W3.
    The train was the Colombo - Badulla Night Mail, no.#1045. It was hauled by two locomotives, one was M2c 627 and the other was an M6. Both locos were double headed, instead of one loco which was supposed to be banking the train from behind. I got info from some driver stating that their is some kind of a gradient into the entry to the Kotagala railway bridge, and the train was a bit too fast while entering the bridge, whereas the carriages started wobbling and bouncing, causing it to derail.
    The W3 in the video is only for the break down train, and there was also an M5c, no.767 involved in the break down train. Making matter worse, even the steam crane which was hauled by M6 795 had also derailed.

    Leave a comment:


  • banuthev
    replied
    Originally posted by nipuna787
    Locomotives were safe (the train consisted two locos) three varies were badly damaged. And track was badly damaged too. The bridge also had some damages. Anyways re-railing works are finished now. Track repairs are going on now. By a day or two they will finish everything I hope.
    What is the train name ? why it was hauled by two locos on the day of the accident ? According to above video, one of the loco which hauled the train was W3.

    Leave a comment:


  • banuthev
    replied
    Train Accident in Hatton

    How did this happened ? did the loco driver exceed the speed limit on the bridge ? Any latest update on Hatton railway line ? have they moved those 3 damaged carriages to Repair centre?
    SLR have to upgrade the upcountry railway lines asap. It's affecting the passenger safely and tourism.



    Source: Lakbima NewsPaper

    Leave a comment:


  • nipuna787
    replied
    Originally posted by banuthev
    Any serious damage to the loco and the train? Hope SLR would complete the railway lines for upcountry with ballasted concrete asap.
    Locomotives were safe (the train consisted two locos) three varies were badly damaged. And track was badly damaged too. The bridge also had some damages. Anyways re-railing works are finished now. Track repairs are going on now. By a day or two they will finish everything I hope.

    Leave a comment:


  • nipuna787
    replied
    Originally posted by banuthev
    Does New Railway tracks with ballasted concrete available beyond Anuradhapura to Kankesanturai and Colombo to Maho line?

    When is SL gov going to start the renovation for Maho to Anuradhapura line?
    Up to PLG and beyond OMT the track is good. Trains can run up to 100kmph and 120kmph respectively (beyond OMT. but recently they have reduced the speed limit as I heard)

    And no, I'm not aware of the time line of the project. I also heard about double tracking proposal. I think it's much needed. And I agree with Mach3 about the condition of the said section. It's in very serious condition and need an repair ASAP.

    Leave a comment:

Working...