  • Haleef
    replied
    Originally posted by banuthev
    Hi Haleef/Harsha - Do you have any updates and information about the construction work of interim terminal at CMB?
    Hi! Saw the the departure walkway had been renovated in an okay way. Now there is enough light inside the walkway, as transparent roofs have been placed. Other than that check-in areas are really crowded and really slow, and it does not seem like an airport in that way, more like a fish market. People don't know where to go, what to do, whom to contact for assistance.

    I also saw a paved area next to Apron Charlie, and it seems to be another Apron being constructed. As said before by a member, possibility of it becoming a remote parking bay. Unfortunately I could not take pictures as I was in the flight deck of UL828 and it was during dusk (Past 1900hrs).

    Leave a comment:


  • dilushasg-bdavi
    replied
    Originally posted by Sidekicker
    In recent videos I've seen on youtube, there seams to me construction of a tarmac near the cargo building. Does anyone have any information about this? Is this what the temporary terminal is?
    That's the large apron with remote gates....part of Phase II
    Last edited by dilushasg-bdavi; 19-12-2017, 12:21 AM.

    Leave a comment:


  • banuthev
    replied
    Originally posted by Sidekicker
    In recent videos I've seen on youtube, there seams to me construction of a tarmac near the cargo building. Does anyone have any information about this? Is this what the temporary terminal is?
    Could you please share the link of the video? Is it being built at the far end near cargo building ? Its better to leave the middle area vacant for the modern terminal which is expected to be built in 2020. So they don't need demolish the prefab terminal.

    Originally posted by Max
    In efforts to boost passenger capacity at the Jomo Kenyatta International Airport the Kenya Airports Authority has put up a prefabricated terminal with a capacity of 2.5 million passengers for both domestic and international passengers.

    https://www.youtube.com/watch?v=FH3JUx0m5jM
    Thanks. Any pictures of construction work ?

    Hi Haleef/Harsha - Do you have any updates and information about the construction work of interim terminal at CMB?

    Leave a comment:


  • Max
    replied
    Originally posted by banuthev
    Where exactly this terminal going to be built at CMB ? any more info?
    In efforts to boost passenger capacity at the Jomo Kenyatta International Airport the Kenya Airports Authority has put up a prefabricated terminal with a capacity of 2.5 million passengers for both domestic and international passengers.

    Leave a comment:


  • Sidekicker
    replied
    In recent videos I've seen on youtube, there seams to me construction of a tarmac near the cargo building. Does anyone have any information about this? Is this what the temporary terminal is?

    Leave a comment: