Sri Lanka Airports

Collapse
This is a sticky topic.
X
X
 
  • Time
  • Show
Clear All
new posts
  • lordvader
    Senior Member
    • Jan 2011
    • 366

    #1021
    Thanks for the pics and Happy New Year to everyone!

    Shame they didn't design that area better though, it looks like a marketplace. They should have had a more open area with more light and a better designed ceiling.

    Comment

    • banuthev
      Administrator
      • Dec 2010
      • 3947

      #1022
      Originally posted by lordvader
      Thanks for the pics and Happy New Year to everyone!

      Shame they didn't design that area better though, it looks like a marketplace. They should have had a more open area with more light and a better designed ceiling.
      Happy New Year !

      I think the flooring of the pathway also have to be changed. It looks the work hasn't been completed yet. Am I correct?

      Comment

      • Haleef
        Senior Member
        • Nov 2012
        • 1468

        #1023
        Originally posted by banuthev
        Happy New Year !

        I think the flooring of the pathway also have to be changed. It looks the work hasn't been completed yet. Am I correct?
        I think it should be done. The main thing they should concern is the entrance to the inside of the airport. It's so crowded and also does not give the feel of entering the airport with just plain walls and so much of security. Like other airports, there shouldn't be too much security check at the entrance of entering the airport premises. Just go straight into Check-In and then do the serious necessary checks that should be done. I don't know if the checks are enough or not, but suggesting that way would give a less time to enter the airport rather than spending so much time in security checks and all.

        Also about the pathway, as member, lordvader said, it looks just like a market place and so congested. The inside after immigration is quite okay now, a quite big and new World Duty Free attracting many tourists now. Quite an improvement from there, but still can do better.

        Anyway not much complaining, it's our country's airport, and we cannot expect it to be the same as another country. So, the more quicker they improve, the more better and convenient it would be!

        HAPPY NEW YEAR 2018!
        Haleef Ismail
        www.youtube.com/haleef1 | www.instagram.com/cmb_spotter

        Comment

        • Serendib
          Senior Member
          • Jan 2011
          • 1807

          #1024
          CMB phase 2 construction work started?



          Source:ak892
          Last edited by Serendib; 02-01-2018, 09:40 PM.

          Comment

          • SpookyFlyer
            Senior Member
            • Nov 2011
            • 187

            #1025
            Originally posted by Serendib
            CMB phase 2 construction work started?



            Source:ak892
            I was in CMB about a week ago (26/12/2017). They have never even started to dig the ground yet between Bravo and Charley parking bays.

            Comment

            • banuthev
              Administrator
              • Dec 2010
              • 3947

              #1026
              Originally posted by SpookyFlyer
              I was in CMB about a week ago (26/12/2017). They have never even started to dig the ground yet between Bravo and Charley parking bays.
              I can see from the above picture that they are digging the ground near Oil tanks. I think its for the preparation for new apron (Echo). The new apron would have 17 parking bays.

              Comment

              • Serendib
                Senior Member
                • Jan 2011
                • 1807

                #1027
                Any news on shifting air force base from CMB to RML?



                Source: rakhita
                Last edited by Serendib; 03-01-2018, 09:25 PM.

                Comment

                • lordvader
                  Senior Member
                  • Jan 2011
                  • 366

                  #1028
                  Originally posted by banuthev
                  I can see from the above picture that they are digging the ground near Oil tanks. I think its for the preparation for new apron (Echo). The new apron would have 17 parking bays.
                  Could be related to this:

                  Comment

                  • banuthev
                    Administrator
                    • Dec 2010
                    • 3947

                    #1029
                    Originally posted by lordvader
                    IIRC , The bid for New Fuel Hydrant System was last cancelled in Aug 17. I doubt the new bid have been confirmed yet. I think they are currently doing the construction for Apron E (Aircraft Parking). I can notice they are digging the ground near taxiway as well.

                    Does CMB really need the new fuel hydrant system now? Isn't that very important that the passenger terminal have to be expanded to meet the increasing passenger demand?

                    Comment

                    • lordvader
                      Senior Member
                      • Jan 2011
                      • 366

                      #1030
                      Originally posted by banuthev
                      IIRC , The bid for New Fuel Hydrant System was last cancelled in Aug 17. I doubt the new bid have been confirmed yet. I think they are currently doing the construction for Apron E (Aircraft Parking). I can notice they are digging the ground near taxiway as well.

                      Does CMB really need the new fuel hydrant system now? Isn't that very important that the passenger terminal have to be expanded to meet the increasing passenger demand?
                      The article is dated November 2017 so I'm guessing it would be the new contract. It also states the hydrant system will be for Apron E. It would be better for CMB to build both at the same time.

                      Hopefully someone can confirm that Apron E is under construction, would be welcome news for everyone.

                      Comment

                      • ULA340
                        Member
                        • Oct 2015
                        • 33

                        #1031
                        Originally posted by lordvader
                        The article is dated November 2017 so I'm guessing it would be the new contract. It also states the hydrant system will be for Apron E. It would be better for CMB to build both at the same time.

                        Hopefully someone can confirm that Apron E is under construction, would be welcome news for everyone.
                        Guys sorry to break all your hearts. Apron E is Phase 2 B as per the papers we should finish Phase 2 A (Terminal building) first then the Phase 2 B.

                        What AASL doing right now is to make room for the construction project. Phase 2 A given to Japanese Construction firm (still no proper timescale) Phase 2 B is still on papers no construction companies yet for the project. Hope thinks will be finalise this year. But the truth is No new terminal until 2020. If they start in 2020 they can finish and get ICAO approval by 2025. Unfortunately it's Sri Lanka and we're unlucky. Hope for some braver Aviation authorities in the future.

                        Comment

                        • skyline
                          Senior Member
                          • Mar 2011
                          • 241

                          #1032
                          Originally posted by ULA340
                          Guys sorry to break all your hearts. Apron E is Phase 2 B as per the papers we should finish Phase 2 A (Terminal building) first then the Phase 2 B.

                          What AASL doing right now is to make room for the construction project. Phase 2 A given to Japanese Construction firm (still no proper timescale) Phase 2 B is still on papers no construction companies yet for the project. Hope thinks will be finalise this year. But the truth is No new terminal until 2020. If they start in 2020 they can finish and get ICAO approval by 2025. Unfortunately it's Sri Lanka and we're unlucky. Hope for some braver Aviation authorities in the future.
                          Shame the CMB terminal looks very old..

                          Comment

                          • SLD
                            Senior Member
                            • Jun 2017
                            • 104

                            #1033
                            Originally posted by skyline
                            Shame the CMB terminal looks very old..
                            What do you mean "looks very old"? It is very OLD!!

                            Comment

                            • ALK511
                              Junior Member
                              • Mar 2015
                              • 4

                              #1034
                              Originally posted by ULA340
                              Guys sorry to break all your hearts. Apron E is Phase 2 B as per the papers we should finish Phase 2 A (Terminal building) first then the Phase 2 B.

                              What AASL doing right now is to make room for the construction project. Phase 2 A given to Japanese Construction firm (still no proper timescale) Phase 2 B is still on papers no construction companies yet for the project. Hope thinks will be finalise this year. But the truth is No new terminal until 2020. If they start in 2020 they can finish and get ICAO approval by 2025. Unfortunately it's Sri Lanka and we're unlucky. Hope for some braver Aviation authorities in the future.
                              Construction work on Apron E has already begun

                              Comment

                              • banuthev
                                Administrator
                                • Dec 2010
                                • 3947

                                #1035
                                Originally posted by ALK511
                                Construction work on Apron E has already begun
                                Good news to know Aircraft parking facility is going to be increased. What is the current process on construction work on Apron E ? Please tell us in detail. I saw a picture last month when they were digging the ground next to oil tanks. I am wondering if that's for Apron E? Any updates on Oil Hydrant System for CMB?

                                Comment

                                Working...