More losses for the taxpayers - as part of any deal the GOSL will have to absorb the building costs.
I have my doubts about the economic viability of this airport - I'd be surprised if anyone actually steps in.Always fly a stable approach - it's the only stability you'll find this businessComment
-
Bandaranaike International Airport and is providing design services as of November 2015

JAC is a comprehensive Japanese airport consulting company. With skilled professionals who work in Japan and abroad, JAC provides advanced technical support for studies, design and airport service operations. Among the areas of specialization that JAC work in are the construction of passenger terminals, aircraft navigation lighting and communications systems.Comment
-
Looks like the residue of the Lotus design on the roof is still left? The rendered design shows some changes to the existing pier roof structure, does that mean the existing pier is also being refurbished or redone?Bandaranaike International Airport and is providing design services as of November 2015

http://jacinc.jp/en/project/world_project2.htmlComment
-
Comment
-
BIA Stage Two ready for tender
The much awaited US$ 500 million Stage 2 development of the Bandaranaike International Airport (BIA) will get underway soon.It is expected to be completed by end 2017.
The airport will be partially closed from January 2017 for urgent runway repairs.The airport will be closed for about six hours from 9.00 a.m. for a period of three months.
The much awaited US$ 500 million Stage 2 development of the Bandaranaike International Airport (BIA) will get underway soon.It is expected to be completed by end 2017. The tender for the “Package B – Remote Apron and Taxiways” will be announced shortly in the print media. The airport will be partially closed from January 2017 for urgent runway repairs.The airport will be closed for about six hours from 9.00 a.m. for a period of three months.Comment
-
The runway is running at about 60% capacity and a new runway is under construction. The choke point is terminal capacity. In the next month ground will be broken on a new terminal which will be a welcome relief.
http://airlines.iata.org/ceo-intervi...ankan-airlinesComment
-
-
So that means construction work for new terminal starts from next month?The runway is running at about 60% capacity and a new runway is under construction. The choke point is terminal capacity. In the next month ground will be broken on a new terminal which will be a welcome relief.
http://airlines.iata.org/ceo-intervi...ankan-airlinesComment
-
Comment
-
2nd runway is mentioned in the Western Megapolis plan it is not connected to the Japanese funded terminal expansion. A new runway is to be built either north or south of the current runway/Comment
-
Yes I think 2nd runway is not been finalised for CMB yet. It appears to be construction work for new terminal starts next month. Resurfacing of the current runway starts in Jan 2017.Comment
-
By next month do you mean June (This Month) or July? Has any construction begun at the airport yet?Comment
-
Earlier the news said they are going to start digging the ground this month to put foundation for second terminal.
any sign at CMB for starting the construction work? Airport website is showing how new terminal going to be like. Web : www.airport.lk
Comment
-
It is embarrassing CAA is carrying free advertisement for Emirates.....Earlier the news said they are going to start digging the ground this month to put foundation for second terminal.
any sign at CMB for starting the construction work? Airport website is showing how new terminal going to be like. Web : www.airport.lkComment

Comment